top of page
Our Services

GEOTHERMAL HEAT PUMP INSTALLATION

Our expert technicians will seamlessly install a geothermal heat pump tailored to your home's needs, ensuring optimal performance and efficiency.

RETROFIT AND UPGRADES

Upgrade your existing HVAC system to geothermal technology and unlock a new level of energy efficiency without extensive renovations.

MAINTENANCE AND REPAIRS

Trust our skilled professionals to keep your geothermal system running smoothly with regular maintenance and timely repairs.

ENERGY AUDITS AND CONSULTATIONS

Discover how geothermal energy can transform your home. Our team provides comprehensive energy audits and personalized consultations to assess your energy needs and recommend the best geothermal solutions.

Jerry Waltman setting up Geothermal system

Our Process

Below is a list of steps that Innovative Energy would take once you have inquired about installing a geothermal heat pump. 

​

1. Site Visit Survey

       Innovative Energy will send a representative to survey your home after you inquire. In this survey, the representative will ask questions about current heating/cooling needs, take notes on supply and return ductwork, and take pictures of your home's exterior for a heating load calculation. 

​

2. Load Calculation

      Upon completing the home survey, Innovative Energy will

then complete a heating load calculation, which takes into

account insulation, number of

windows, solar exposure... This calculation will determine how

many BTUs/hour of heating and cooling your house will need

to stay comfortable.

​

3. Proposal

       Once the load calculation is complete, Innovative Energy will begin preparing your proposal bid binder, which will include your load calculations, contract, references, and geothermal installation details. This proposal will be a three-ringed binder consisting of your load calculations, contract, references, geothermal installment details, and more. IE will then present this proposal to you and allow you to take the binder home and discuss next steps.

​

4. Installment

       If you, the customer, approve the proposal, you will sign the contract, and IE will begin installation. The first steps in the installation would be to order the specific geothermal unit and drill the ground loops. After the ground loops are in and the heat pump is in the shop, Innovative Energy will come to the site to remove the existing furnace (if a retrofit) and install the new geothermal heat pump. IE expects the installation of the new unit to take 3 days or less once the loops and parts are in. 

​

5. Comfort

       After the installation of the new geothermal heat pump, IE will answer any remaining questions and set up your thermostat to meet your specific comfort needs. Once that is all done, you can start enjoying your heating or cooling, made directly from our home planet.

​

​

​

Geothermal Heating Load Calculation
bottom of page